PJNEWSPOWER OF JOURNALISM
Cities

HYDRAA Revives Sunnam Cheruvu, Expands Lake From 14 to 32 Acres

Share:
HYDRAA Revives Sunnam Cheruvu, Expands Lake From 14 to 32 Acres
HYDRAA Revives Sunnam Cheruvu, Expands Lake From 14 to 32 Acres
The PJ Herald | Hyderabad: Sunnam Cheruvu, once affected by encroachments and pollution, has undergone a significant transformation following restoration …

The PJ Herald | Hyderabad: Sunnam Cheruvu, once affected by encroachments and pollution, has undergone a significant transformation following restoration works undertaken by the Hyderabad Disaster Response and Asset Protection Agency (HYDRAA).

The lake's restored area has expanded from 14 acres to 32 acres, while its water storage capacity has increased from 47.58 million litres to 200 million litres.

Chief Minister A. Revanth Reddy is expected to inaugurate the rejuvenated lake on December 2 or 3, although the official inauguration date is yet to be confirmed.

Join the PJ NEWS WhatsApp Channel

Get important news and breaking updates directly.

Join Now

Enhanced Flood Management

Improvements to water flow systems form an important component of the restoration project. The increased storage capacity and improved drainage arrangements are expected to help mitigate flood risks in neighbouring localities, particularly Guttala Begumpet and Navabharat Nagar.

The restoration assumes significance in the context of Hyderabad's expanding urban landscape, where protecting natural water bodies remains important for sustainable development and stormwater management.

Recreational Facilities for Residents

The lakefront has also been developed as a public recreational space. A 1.35-kilometre walking track, landscaped parks, children's play areas, an open gym and a dedicated lake-view point have been added.

These amenities are intended to provide residents with accessible spaces for exercise, leisure and outdoor activities.

HYDRAA Commissioner A.V. Ranganath visited Sunnam Cheruvu on Wednesday night to inspect the restoration and development works ahead of the proposed inauguration.

The project combines water conservation, urban flood mitigation and recreational infrastructure within a single lake restoration initiative.

Maintaining the restored water body will require continued monitoring, prevention of fresh encroachments and effective measures against pollution.

The formal inauguration schedule and subsequent arrangements for public access are awaited.

Join the PJ NEWS WhatsApp channel for more news

Get the latest stories and breaking news on WhatsApp.

Join WhatsApp Channel